Directional Boring (HDD) Cost & Planning Calculator

Plan a horizontal directional bore: final reamer size from the product pipe, hole volume, drilling fluid, spoil to vacuum, rig days and an installed-cost estimate based on Florida DOT bid averages.

Prices for your area

Directional Boring (HDD) Cost & Planning Calculator — ConcreteNear.com

Final reamer size 6 in · $15,643
Final reamer size6 in
Bore hole volume441 gal
Drilling fluid to plan1,322 gal
Spoil + fluid to vacuum (approx.)8.7 yd³
Rig days1.5 days

Cost estimate U.S. average prices

Conduit installed by directional bore
300 LF × $41.81
$12,543
Mobilization
1 job × $1,500
$1,500
Pits & potholes
4 each × $400.00
$1,600
Estimated total$15,643
  • Call 811 and pothole every crossing utility before you bore.
  • Plan a vacuum truck for drilling-fluid returns — dumping slurry on site is often illegal.
Email results
Inputs
Bore length300 ft
Product pipe / bundle outside diameter4 in
Back-ream ratio1.5
GroundClay / silt
Drilling fluid (× hole volume)3
Production (ft per rig-day incl. pullback)400 ft
Pits & potholes4

Planning estimate only — confirm with your supplier or contractor.

Prices used — edit any price to match your local quote
ItemUnit priceBasis & source
Conduit installed by directional bore
per LF
public source Florida DOT Item Average Unit Cost 2025, item 0630 2 12 Conduit, Furnish & Install, Directional Bore (194 contracts, 708,221 LF) (2025 lettings) — Typical small-diameter traffic/ITS conduit. Same source: open-trench conduit averaged $18.04/LF.
Bore rig mobilization
per job
starting estimate Starting estimate.
Entry/exit pit or pothole
per each
starting estimate Starting estimate.

Email these results

We send one email with these results to the address you enter — nothing else. We don't store your address or add it to any list.

Get a real quote

Calculators get you close. A local company can quote your exact job.

How to use this calculator

  1. Enter bore length and product pipe or bundle OD.
  2. Keep a 1.5 ream ratio unless your plan says otherwise.
  3. Pick ground conditions and a fluid factor.
  4. Enter production and pits for rig days and cost.

Formulas

  • Reamer diameter = product OD × back-ream ratio (1.5 is a common rule)
  • Hole volume (gal) = π × (reamer ÷ 2)² × length × 7.48
  • Drilling fluid ≈ hole volume × fluid factor (commonly 3–5× in sand, more in clay)

Questions

What size reamer for HDD?

A common rule of thumb is 1.5 × the product pipe outside diameter (often +4 in for small pipe).

How much does directional boring cost per foot?

It varies by ground, pipe size and length. Florida DOT's 2025 statewide average for conduit furnished and installed by directional bore was $41.81 per foot (vs. $18.04 for open trench). Rock costs much more.

Where does the drilling mud go?

Returns are usually vacuumed and hauled to an approved site. Plan a vac truck.

Sources & assumptions

Prices checked 2026-11-10. State pricing multiplies national figures by the U.S. Bureau of Economic Analysis regional price parities (goods for materials, services for labor and services). RPPs compare general consumer price levels (U.S. = 100). They are not construction-specific; we use RPP Goods for materials and RPP Services: Other (excludes rents) for labor and services.

Starting estimates No public price series was found for: Bore rig mobilization; Entry/exit pit or pothole. These defaults are editable placeholders — replace them with a local quote.

Results are planning estimates, not quotes or engineering advice. Codes, specifications and your supplier's numbers govern.