Equipment Hauling Cost & Permit Calculator

Check a machine against federal width and weight limits and the common 13.5 ft height limit, see whether permits and escorts are likely, and estimate hauling by the mile.

Prices for your area

Equipment Hauling Cost & Permit Calculator — ConcreteNear.com

Permit needed? No — legal-size load · $968.72
Permit needed?No — legal-size load
Loaded height12 ft
Gross vehicle weight70,000 lb
Escort vehicles (typical)0
Drive time at 50 mph4.8 hr

Cost estimate U.S. average prices

Truck miles (loaded + empty)
240 mi × $2.34 × 1.25
$702.00
Load, secure & unload
2 hr × $106.69 × 1.25
$266.73
Estimated total$968.72
  • Escort, flag and travel-time rules differ by state — the hauler pulls permits and plans the route.
  • Measure the machine in its transport position (bucket curled, boom down).
Email results
Inputs
Machine weight30,000 lb
Machine width8.5 ft
Machine height (as loaded)10 ft
TrailerLowboy (≈2 ft deck)
Truck + trailer empty weight40,000 lb
Loaded miles120 mi
Empty (deadhead) miles120 mi
States crossed1
Load + unload + securement time2 hr

Planning estimate only — confirm with your supplier or contractor.

Prices used — edit any price to match your local quote
ItemUnit priceBasis & source
Truck operating cost per mile
per mi
public source ATRI, An Analysis of the Operational Costs of Trucking: 2026 Update — average marginal cost per mile, 2025 (2025 data, published Jul 2026)
Truck operating cost
per hr
public source ATRI, An Analysis of the Operational Costs of Trucking: 2026 Update, Table 9 — average marginal cost per hour, 2025 (fuel, truck payments, repairs, insurance, tires, tolls, driver wages and benefits) (2025 data, published Jul 2026) — For-hire fleet cost before overhead and profit. Local dump and lowboy rates are usually higher; use the overhead % to adjust.
Hauler overhead & profit
per %
starting estimate Starting estimate added on top of the ATRI operating cost.

Email these results

We send one email with these results to the address you enter — nothing else. We don't store your address or add it to any list.

Get a real quote

Calculators get you close. A local company can quote your exact job.

How to use this calculator

  1. Enter the machine's weight, width and transport height.
  2. Pick the trailer type.
  3. Enter loaded and empty miles and states crossed.
  4. Read the permit check and cost.

Formulas

  • Loaded height = machine height + trailer deck height
  • Gross weight = machine + truck and trailer
  • Over 8.5 ft wide or 80,000 lb gross → permit (federal limits); over 13.5 ft high → permit in most states

Questions

How wide can a load be without a permit?

8.5 ft (102 in) on the National Network under federal rules (23 CFR 658.15).

What is the legal height limit?

There is no federal height limit; most states use 13.5 ft, some 14 ft or more. Check each state on your route.

When do I need a pilot car?

Each state sets its own escort rules by width, height and length. The calculator flags typical thresholds; your hauler confirms.

Sources & assumptions

Prices checked 2026-11-10. State pricing multiplies national figures by the U.S. Bureau of Economic Analysis regional price parities (goods for materials, services for labor and services). RPPs compare general consumer price levels (U.S. = 100). They are not construction-specific; we use RPP Goods for materials and RPP Services: Other (excludes rents) for labor and services.

Starting estimates No public price series was found for: Oversize/overweight permit; Pilot/escort car; Hauler overhead & profit. These defaults are editable placeholders — replace them with a local quote.

Results are planning estimates, not quotes or engineering advice. Codes, specifications and your supplier's numbers govern.