Length times width times thickness, in feet, divided by 27 is a cubic yard. Add about 5 to 10 percent so you do not run short mid-pour. Planning estimates only.

47 seconds · Uploaded

Transcript

Want to know how much concrete that slab needs? Here's the one-line formula. Length times width times thickness, in feet, then divide by 27. That's a cubic yard. Thickness has to be in feet, so four inches is one-third of a foot. A 10-by-20 foot patio at four inches is about two and a half yards. Most crews add a little extra, around five to ten percent, so you don't run short mid-pour. Running short can leave a cold joint. Work it out by hand, or use the slab calculator at concretenear.com. It also shows bags, and when a short-load truck makes more sense. Then find a local ready-mix or short-load plant at concretenear.com.