Shotcrete & Gunite Calculator

Sprayed concrete loses material to rebound. Enter the surface area and thickness to get the in-place volume, what to order, and crew days.

Prices for your area

Shotcrete & Gunite Calculator — ConcreteNear.com

Material to order 9 yd³ · $5,300
Material to order9 yd³
In-place volume7.41 yd³
Lost to rebound0.82 yd³
Crew days1 days

Cost estimate U.S. average prices

Shotcrete material
9 yd³ × $200.00
$1,800
Rig, nozzleman & crew
1 day × $3,500
$3,500
Estimated total$5,300
  • Never reuse rebound — it is weak and full of voids.
  • Wet-mix gives a more consistent water-cement ratio and less dust.
Email results
Inputs
Surface area600 ft²
Average thickness4 in
ProcessWet-mix shotcrete
Rebound loss10%
Other waste / overspray5%
Crew output (per day)25 yd³

Planning estimate only — confirm with your supplier or contractor.

Prices used — edit any price to match your local quote
ItemUnit priceBasis & source
Shotcrete / gunite material
per yd³
starting estimate Starting estimate for delivered wet-mix material.
Shotcrete pump & nozzle crew
per day
starting estimate Starting estimate for a rig, nozzleman and crew per day.

Email these results

We send one email with these results to the address you enter — nothing else. We don't store your address or add it to any list.

Get a real quote

Calculators get you close. A local company can quote your exact job.

How to use this calculator

  1. Measure the sprayed surface area (pool shell, wall face or slope).
  2. Enter the average thickness.
  3. Pick wet or dry process and a rebound percentage.
  4. Read the order quantity and crew days.

Formulas

  • In-place yd³ = area × thickness (in) ÷ 12 ÷ 27
  • Order = in-place ÷ (1 − rebound %) × (1 + other waste %)
  • Crew days = order ÷ yards placed per day

Questions

How much rebound is normal?

Rebound depends on process, mix, nozzle work and whether you spray overhead. Wet-mix typically loses less than dry-mix gunite. Use your contractor's number if you have one.

How many yards does a pool take?

Measure the shell area (floor plus walls) and multiply by thickness. A 500 ft² shell at 6 in is about 9.3 yd³ in place before rebound.

Shotcrete or gunite?

Shotcrete usually means wet-mix; gunite is dry-mix with water added at the nozzle. Both make strong, dense concrete with good crews.

Sources & assumptions

Prices checked 2026-11-10. State pricing multiplies national figures by the U.S. Bureau of Economic Analysis regional price parities (goods for materials, services for labor and services). RPPs compare general consumer price levels (U.S. = 100). They are not construction-specific; we use RPP Goods for materials and RPP Services: Other (excludes rents) for labor and services.

Starting estimates No public price series was found for: Shotcrete / gunite material; Shotcrete pump & nozzle crew. These defaults are editable placeholders — replace them with a local quote.

Results are planning estimates, not quotes or engineering advice. Codes, specifications and your supplier's numbers govern.