Concrete & Soil Testing Calculator

Calculate the minimum number of concrete strength tests under ACI 318's sampling frequency, the cylinders to cast, field technician time and soil compaction tests — with an editable lab budget.

Prices for your area

Concrete & Soil Testing Calculator — ConcreteNear.com

Strength tests required (minimum) 5 · $2,776
Strength tests required (minimum)5raised to the 5-batch minimum
Cylinders to cast25
By frequency (per day / 150 yd³ / 5,000 ft²)3
Batches (truckloads)30
Slump, air & temperature sets5
Site visits5

Cost estimate U.S. average prices

Cylinder compressive tests
25 cylinder × $35.00
$875.00
Field technician
12 hr × $33.17 × 2
$796.08
Nuclear density tests
12 test × $40.00
$480.00
Proctor tests
1 test × $250.00
$250.00
Trip charges
5 trip × $75.00
$375.00
Estimated total$2,776
  • Your project specification can require more testing than the ACI 318 minimum — it governs.
  • If a mix totals under 50 yd³, the building official may waive strength tests when there is evidence of satisfactory strength.
Email results
Inputs
Concrete of one mix300 yd³
Days that mix is placed3 days
Slab & wall surface area8,000 ft²
Truck size (for batch count)10 yd³
Cylinders per strength test3 × 4×8 in cylinders
Extra cylinders per test (7-day / hold)2
Soil compaction (density) tests12
Proctor tests1
Field technician hours per pour day4 hr

Planning estimate only — confirm with your supplier or contractor.

Prices used — edit any price to match your local quote
ItemUnit priceBasis & source
Compressive strength test (per cylinder)
per cylinder
starting estimate Starting estimate for molding, curing, pickup and breaking.
Field testing technician wage
per hr
public source BLS OEWS May 2025, 17-3022 Civil Engineering Technologists and Technicians (May 2025)
Nuclear density (compaction) test
per test
starting estimate Starting estimate per test location.
Proctor (moisture-density) lab test
per test
starting estimate Starting estimate.
Technician trip charge
per trip
starting estimate Starting estimate.
Labor markup (wage → billed rate)
per ×
starting estimate Starting estimate covering payroll taxes, insurance, benefits, overhead and profit. Many contractors land between 1.6× and 2.5×.

Email these results

We send one email with these results to the address you enter — nothing else. We don't store your address or add it to any list.

Get a real quote

Calculators get you close. A local company can quote your exact job.

How to use this calculator

  1. Enter the yards of one mix and the days it is placed.
  2. Enter the slab and wall surface area.
  3. Pick 4×8 (3 per test) or 6×12 (2 per test) cylinders.
  4. Add soil density and Proctor tests.

Formulas

  • Tests ≥ the largest of: 1 per day, 1 per 150 yd³, 1 per 5,000 ft² of slab or wall surface
  • If that gives fewer than 5 tests, test at least 5 randomly selected batches (or every batch if fewer than 5)
  • Cylinders = tests × (cylinders per test + extra cylinders)

Questions

How often are concrete cylinders taken?

ACI 318 requires a strength test at least once a day, once per 150 yd³ and once per 5,000 ft² of slab or wall for each mix — whichever gives the most tests — and at least five batches.

How many cylinders make a test?

The average of two 6×12 in cylinders or three 4×8 in cylinders, broken at 28 days (or the specified age).

Why are lab prices estimates?

Lab fee schedules vary by region and are not published as a national series — replace them with your lab's fee schedule.

Sources & assumptions

Prices checked 2026-11-10. State pricing multiplies national figures by the U.S. Bureau of Economic Analysis regional price parities (goods for materials, services for labor and services). RPPs compare general consumer price levels (U.S. = 100). They are not construction-specific; we use RPP Goods for materials and RPP Services: Other (excludes rents) for labor and services.

Starting estimates No public price series was found for: Compressive strength test (per cylinder); Nuclear density (compaction) test; Proctor (moisture-density) lab test; Technician trip charge; Labor markup (wage → billed rate). These defaults are editable placeholders — replace them with a local quote.

Results are planning estimates, not quotes or engineering advice. Codes, specifications and your supplier's numbers govern.